Not only was this the summit of railway engineering achievement at the time it was also the first major Press / Public relations event designed with much hoopla to drum up both business but also shareholders and investors in what was a massive financial gamble.
It was the result of far seeing men and the plans outlined in Mr. J. J. Warner's Report on Railroads to the Senate of California in early 1851 in which he stated:
"that a Railroad, from some point on the Mississippi, or its tributaries, to some point on the bay of San Francisco, is the best route that can be adopted for the purpose of securing the Commerce of China and India; ... to open a great national highway from California to the Atlantic coast, [and] would be a greater defence and protection than all other military works. It would also be the means of great daily intercourse between the East and West coast of this Republic, ... to prevent those sectional feelings which have ever been the destruction of wide-extended governments. ...[I]t is the duty of this Legislature to encourage the speedy building of a Railroad from the Atlantic to the Pacific, across the territory of the United States."

It united a nation (although a favoured more Southern route was ignored)and laid the foundations of east West trade which had previously been dominated by North / South ruiver trading.
Jupiter and the Central Pacific
In September 1868, Schenectady Locomotive Works of New York built Central Pacific locomotives Storm, Whirlwind, Leviathan and Jupiter. All Central Pacific locomotives built until 1870, were dismantled from their frames, loaded onto a ship, and taken around South America’s Cape Horn to San Francisco, California.
There the engines were loaded onto a barge and towed upriver to Central Pacific HQ in Sacramento. Then they were reassembled and commissioned into service on March 20, 1869. Less than two months later, Jupiter (fuelled by wood alone) pulled Central Pacific’s President, Leland Stanford’s,special train to Promontory Summit, for the Golden Spike Ceremony.
Locomotive 119 and the Union Pacific
In November 1868, Rogers Locomotive and Machine Works of Paterson, New Jersey, built Union Pacific locomotives No. 116, through 120. However the journey of Union Pacific Vice-President Thomas Durant and his contingent of dignitaries to Promontory Summit., was not simple or swift.
En route to Promontory for the ceremony, (originally scheduled for May 8th) , the Durant Special was forced onto a siding and stopped at the little town of Piedmont, Wyoming, not far from the Utah border.
Here there were 400 tie cutters to greet Durant, not concerned with historical events but their pay for the last 3 months. They chained his coach to the siding for 2 days until their pay arrived.
During this delay the Weber River continued to rise through continuing rains and at the appropriately named Devil’s Gate Bridge, the locomotive’s engineer saw that the swollen waters had damaged and removed some bridge supports, leaving the bridge usafe to carry the engine.
The engineer (evidently a brave man ) assured Durant's party that the This left the bridge would support the lighter passenger coaches. The engineer gave each
coach a push with his locomotive. The cars laden with nervous dignitaries then coasted safely across the unstable structure to be stranded without an engine.
Sitting in Ogden were the five Union Pacific locomotives and No 119 was cosen to complete the historic but delayed journey.

Within the site is a 20-foot limestone arch , which has now been renamed Chinese Arch in honor of the immigrant 19th century Chinese railroad workers who actually did the hard work for 5 gruelling years....and 7 years ahead of schedule... At the height of construction, over 10,000 Chinese were employed by the Central Pacific. The Central Pacific Railroad first broke ground 4 years earlier on January 8, 1863 at Front and "K" Streets in Sacramento, California .
Finally , the CPRR was 742 miles long, extending from Sacramento to Ogden, and the UPRR was 1,032 miles long, extending from Ogden to Omaha. The total length of the first transcontinental railroad was 1,774 miles. The CPPR had 6,213 feet of tunnels compared to only 1,792 feet of tunnels in the UPRR. On April 28, 1869, the men of the CPRR broke all records, before or since, by laying ten miles of track in twelve hours.

Click on pictures to enlarge
UPDATE : Useful introduction to the expansion of the railroads , the money made, the corruption and the characters who forged the basis of American capitalism are covered in Jack Beatty's recently published Age of Betrayal- The Triumph of Money in America 1865 - 1900. Knopf . ISBN 97814000402855 Amazon
"Politicians in cahoots with railway executives made it simple. "Of the seventy-three men who held cabinet posts between 1868 and 1896," Beatty calculates, "forty-eight either served railroad clients, lobbied for railroads, sat on railroad boards, or had railroad-connected relatives." Plus ca change
No comments: